Through exceptional efforts and continuous work, the Services Affairs Department at Al-Zahraa University, headed by Eng. Hassan, Head of the Department, has completed most of the annual maintenance works scheduled to be carried out during this year’s summer recess.

The maintenance of the ARO system (the water treatment system) has been completed, with its performance tested to ensure the highest level of efficiency through water supply, operation, and sample testing. The system operators confirmed satisfactory results.

Maintenance and replacement of furniture in the rooms of the University’s Dormitories have also been carried out. In addition, maintenance of the generators and electrical circuit breakers has been completed, along with the fire protection system by Civil Defence personnel. Periodic maintenance of split air-conditioning units and internal VRF units has also been completed.

Work has also commenced on preparing the rear gardens and manufacturing shades by skilled workers at the University’s specialised metalworking workshops.

Translated by Zahra’ Ala’